Temporary Hlaing River closure for transmission cable installation

IMG 225621 sskm
The image shows boats and vessels crossing the Hlaing River.

The Department of Water Resources and Improvement of River Systems has issued a warning that the waterway will be closed during the installation of a 500 kV electricity transmission cable above the Hlaing River to ensure the safety of vessels.
The connection of the cable between Phayagyi and Hlinethaya will take place near Wahtaya village from 8 am to 4 pm daily, from 25 June to 4 July.
During the installation of the transmission line, the supervisory team will monitor the site by boat, both upstream and downstream, and will temporarily close the waterway.
The statement advises vessels intending to pass through the waterway to stop and wait at a safe distance from the work site and to proceed only with the permission of the supervisory team. — TWA/MKKS

Share this post
Hot News
Hot News
Tatmadaw education schools, Tatmadaw BEHSs turn out 392 distinction winners in matric exam 2024
MNHRC inspects Yamethin Prison, Kintha 1 & 2 Production Camp
Myanmar ambassador to Japan engages with Kumamoto officials, business leaders
Myanmar to participate in 36th VECONAC, 23rd General Assembly in Singapore
Strand Road Night Market opens in Magway
MoE Union Minister receives Ambassador of India
DPM MoD Union Minister leaves for Vietnam to attend state funeral
Myanmar, India to enhance cooperation in e-ID system
DPM MoFA Union Minister attends China-South Asia Expo opening
Indian Ambassador calls on MoHT Union Minister