The Yangon Electric Power Corporation has announced power outages will occur in some townships from 28 to 30 April for maintenance work of the 230-kV Myaungtaga main station.
They will conduct maintenance work for the 230/33/11 kV, bushing of 3 banks of the main transformer.
During the maintenance work, some parts of Hmawby, Taikkyi, Myaungtaga, Oakkan and Aphyauk townships will face temporary power outrages from 8 am to 10 am. — TWA/MKKS