K400-mln Thanatpin-Kyaungsu bridge opened to rural community in Bago Region

IMG dbc4a29cb856c9bccd66449073abfdf3 V sskm
The concrete bridge, with a bored pile foundation, has a load capacity of 30 tonnes. The bridge is 260 feet long and 18 feet wide. The bridge clearance is 9 feet.

A K400-million rural bridge project connecting Thanatpin Township to Minywar Kyaungsu village has been officially opened to facilitate transportation.
The bridge will help lessen transport difficulties and boost the rural economy, covering ten villages with 1,411 households and over 6,800 rural people.
The concrete bridge, with a bored pile foundation, has a load capacity of 30 tonnes. The bridge is 260 feet long and 18 feet wide. The bridge clearance is 9 feet.
The Department of Rural Road Development (Thanatpin) has been building the roads and bridges to cover 70 per cent of the rural population in Bago Region. This rural bridge was constructed over the Bago-Sittoung canal. — Kayan Soe Myint/GNLM

Share this post
Hot News
Hot News
Beef price rises amid transport situation
School accessories sale begins increasing
People over 45 top among heat stroke patients
2023-2024 academic year Grade 10 outstanding students arrive in Taunggyi
Grade 9 outstanding students welcomed in Bagan
Honorary reception held for outstanding students in Yangon
Spreading misinformation: security forces arrested 60 people for military service
Myanmar film ‘Mysterious Snow’ screens at ASEAN Film Festival in London
Myanmar Music Day to celebrate with music entertainment programmes
Myanmar Consul-General promotes investment at Kunming trade event