Installation of 33kV power cable to temporarily close Twantay Canal

NATIONAL NEWS

The Directorate of Water Resources and Improvement of River Systems issued a waterway reminder that the installation of 33kV Hlinethaya-Twantay power cable across Twantay Canal will be undertaken between mileposts 11.5 and 12 of the canal from 8 am to 4 pm during the period from 11 to 13 September.
During the working period, the supervisory team will temporarily prohibit the running of vessels upstream and downstream in the waterway of the canal.
The vessels which will drive in the canal need to wait at a safe place from the workplace. The vessels should drive in the canal passing the workplace only if the supervisory team allows them. —MNA

Share this post
Hot News
Hot News