Hydropower and solar energy of Kanyin reservoir to produce 29.9 MW of electricity

၂၀
A general view of the Kanyin reservoir in Ingapu Township.

Union Minister of Electric Power U Thaung Han, during his inspection tour of the Kanyin reservoir in Ingapu township of Ayeyawady region on 23 December, said that, according to the pre-feasibility studies, 29.9 megawatts of electricity can be produced from hydropower and solar energy from the reservoir.
In addition, the Union minister underscored that the technological needs will be fulfilled with the arrangements of the regional government as soon as possible.
The wind energy project is being implemented in Ayeyawady Region and it should be launched as soon as possible for the socioeconomic development of the region, Union Minister U Thaung Han added.
The Kanyin Dam Project was built in the 2002-2003 financial year and was completed in the 2011-2012FY, and the irrigation system was started in the 2017-2018FY. —TWA/MKKS

Share this post
Hot News
Hot News
Union Information Minister inspects Pyinmana-Thabyay Taung MRTV retransmission station
NSA Union Minister hosts dinner for BIMSTEC delegates
DPM MoFA Union Minister receives Russian Ambassador
Myanmar attends India-ASEAN Trade Conference 2024 in India
NSA & Union Minister receives BIMSTEC national security chiefs
Myanmar calls for collaboration to ensure food, energy security during 4th BIMSTEC National Security Chiefs’ Meeting
SAC Vice-Chair Deputy PM Vice-Senior General Soe Win receives Russian Ambassador to Myanmar
Myanmar, Sri Lanka to promote sector-wise cooperation
E-government initiative key to advancing digital economy
‘With Rain’ displays at Artistic Space art gallery