MoEP Dy Minister inspects replacement of main station, towers damaged by Cyclone Mocha

11 sskm
Deputy Minister for Electric Power U Aye Kyaw inspects control room of Ponnagyun main station on 21 May.

Deputy Minister for Electric Power U Aye Kyaw inspected the replacement and repair work of the 123 kV Ponnagyun main station and substitution of towers in collapsed towers of 230kV An-MraukU-Ponnagyun national grid in Rakhine State yesterday.
First, the Deputy Minister checked the completion work in the Control Room and Switch yard of the 230 kV Ponnagyun main station, the preparation of the staff housing, and arrival of the tower and accessories to be replaced. After that, he and his team went to Towers No 424 and 425 in Ponnagyun Township and inspected the removal of the damaged towers and the restoration of the damaged foundations.
The repair works for the 230 kV Ponnagyun main stations are nearing completion, with approximately 90 per cent of the task already finished. The ministry is diligently collaborating with a team of 567 engineers and a skilled workforce to expedite the repair works of the power lines. —MNA/KZW

Share this post
Hot News
Hot News
More than K15.2million donated to 38 poor patients for kidney dialysis
421 EPS Myanmar workers sent to ROK on E-9 visa in April
Medicinal dried bitter bean seeds sell well but not as well as fresh beans
About 250 MoU workers sent to Thailand by air for the first time
Qualified law officers prestigiously serve legislative, executive and judicial duties
IPRD launches capacity-building training 1/2024
Vice-Senior General Soe Win comforts Tatmadaw members wounded in serving State defence and security duties, meets departmental officials in Kayin and Mon states
Malicious media alleges security forces use 50 Thandwe residents as human shields
Myanmar delegation returns after PRC working visit
River water pumping boosts 15,492 acres of summer paddy in 2023-2024, estimated to supply 17,595 acres this year